Farm Storage Facility Loan Program

From: GPO_Access_USDA
Date: 2000/05/11


[Federal Register: May 11, 2000 (Volume 65, Number 92)]
[Rules and Regulations]
[Page 30345-30351]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11my00-4]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Commodity Credit Corporation

7 CFR Part 1436

RIN 0560-AG00

Farm Storage Facility Loan Program

AGENCY: Commodity Credit Corporation, USDA.

ACTION: Interim rule.

-----------------------------------------------------------------------

SUMMARY: This rule implements the Commodity Credit Corporation's
(CCC's) Farm Storage Facility Loan program utilizing authority in the
CCC Charter Act. The program will provide financing for producers to
build or upgrade farm storage and handling facilities.

DATES: This rule is effective May 11, 2000. Comments concerning this
rule should be received on or before June 12, 2000 to be assured
consideration. Comments on the information collections in this rule
must be received by July 10, 2000 to be assured consideration.

ADDRESSES: Comments must be submitted to Grady Bilberry, Director,
Price Support Division, Farm Service Agency, 1400 Independence Avenue,
S.W., STOP 0512, Washington, DC 20250-0512.

FOR FURTHER INFORMATION CONTACT: Chris Kyer, (202) 720-7935 or e-mail
chris_kyer@wdc.fsa.usda.gov.

SUPPLEMENTARY INFORMATION:

Executive Order 12866

    This rule is issued in conformance with Executive Order 12866 and
has been determined to be economically significant and has been
reviewed by the Office of Management and Budget.

Regulatory Flexibility Act

    It has been determined that the Regulatory Flexibility Act is not
applicable to this rule because the Farm Service Agency is not required
by 5 U.S.C. 553 or any other provision of law to publish a notice of
proposed rulemaking with respect to the subject matter of this rule.

Environmental Evaluation

    It has been determined by an Environmental Evaluation that this
program, as a whole, will have no significant impact on the quality of
the human environment. Therefore, neither an Environmental Assessment
nor an Environmental Impact Statement for the program is needed.
However, because it is possible that individual projects may have
limited impacts on the local environment, environmental evaluations for
each project will be conducted to determine the need for environmental
assessment and/or mitigation.

Executive Order 12988

    This rule has been reviewed in accordance with Executive Order
12988. The provisions of this rule preempt State laws to the extent
such laws are inconsistent with the provisions of this rule. Before any
legal action may be brought regarding determinations of this rule, the
administrative appeal provisions set forth at 7 CFR part 780 must be
exhausted.

Executive Order 12372

    This program is not subject to the provisions of Executive Order
12372, which require intergovernmental consultation with State and
local officials. See the notice related to 7 CFR part 3014, subpart V,
published at 48 FR 29115 (June 24, 1983).

The Unfunded Mandates Reform Act of 1995

    This rule contains no Federal mandates under the regulatory
provisions of Title II of the Unfunded Mandates Reform Act of 1995
(UMRA) for State, local, and tribal governments or the private sector.
Thus, this rule is not subject to the requirements of sections 202 and
205 of the UMRA.

Paperwork Reduction Act of 1995

    A Notice with request for comments on the information collection is
part of this proposed rule. An emergency information collection package
has been sent to OMB for review.
    In accordance with the Paperwork Reduction Act of 1995, this notice
announces the Commodity Credit Corporation's (CCC) request for approval
of a new information collection in support of the Farm Storage Facility
Loan Program.
    Title: 7 CFR 1436, Farm Storage Facility Loan Program Regulations.
    OMB Control Number: 0506-NEW.
    Type of Request: Approval of an information collection.
    Abstract: This information is needed to administer the CCC's Farm
Storage Facility Loan Program. The information will be gathered from
producers needing additional on-farm grain storage and handling
capacity to determine whether they are eligible for loans.
    Estimate of Burden: Public reporting burden for this collection of
information is estimated to average 22 minutes per producer.
    Respondents: Eligible producers: 200.000.
    Estimated Number of Respondents: 50,000.
    Estimated Number of Responses per Respondent: 2.
    Estimated Total Annual Burden on Respondents: 47,250 hours.
    Proposed topics for comments are: (a) Whether the collection of
information is necessary for the proper performance of the functions of
the agency, including whether the information will have practical
utility; (b) the accuracy of the agency's estimate of burden including
the validity of the methodology and assumptions used; (c) ways to
enhance the quality, utility, and clarity of the information to be
collected; or (d) ways to minimize the burden of the collection of
information on those who are to respond, including the use of
appropriate automated, electronic, mechanical or other technological
collection techniques or other forms of information technology.
    Comments should be sent to the Desk Officer for Agriculture, Office
of Information and Regulatory Affairs, Office of Management and Budget,
Washington, DC 20503 and to Chris Kyer, USDA--Farm Service Agency--
Price Support Division, 1400 Independence Avenue, SW., STOP 0512,
Washington, DC 20250-0512; Telephone (202) 720-7935 or e-mail
chris_kyer@wdc,fsa.usda.gov. Copies

[[Page 30346]]

of the information collection may be obtained from Chris Kyer at the
above address.
    All responses to this notice will be summarized. All comments will
also become a matter of public record.

Executive Order 12612

    It has been determined that this rule does not have sufficient
Federalism implications to warrant the preparation of a Federalism
Assessment. The provisions contained in this rule will not have a
substantial direct effect on States or their political subdivisions, or
on the distribution of power and responsibilities among the various
levels of government.

Immediate Effectiveness of This Rule

    It has been determined that this rule should be issued as an
interim rule, without prior comment, but subject to modification on the
consideration of those comments that are timely received. It has been
determined that to delay the implementation of the rule pending comment
would be impracticable and contrary to the public interest. That
finding is based on the current shortage of available storage, rapidly
changing market needs that are forcing producers to consider new
storage arrangement on their farms, and the lack of material adverse
effect on other parties. With respect to storage availability, recent
data indicates a critical shortage of storage that continues to
deteriorate. The Deputy Administrator for Commodity Operations, Farm
Service Agency, recently completed an analysis of on-farm and
commercial grain storage utilization, which showed that the utilization
of both on-farm and commercial storage had increased from 79 percent
utilization in 1996 to 95 percent utilization in 1999. At the time of
the review, eleven key grain producing states were utilizing over one
hundred percent of available storage capacity when including temporary
and emergency storage. Four other states were at ninety percent of
storage capacity. The fifteen states identified with ninety percent or
above utilization of grain storage capacity are: Arkansas, Colorado,
Illinois, Indiana, Iowa, Kansas, Louisiana, Michigan, Minnesota,
Mississippi, Missouri, Nebraska, Ohio, South Dakota, and Wisconsin. In
1998 the requests by warehouse operators with CCC Uniform Grain Storage
Agreements for emergency (on the ground) storage were at a level of
192.3 million bushels; for 1999, that level increased to 238.1 million
bushels.
    Also, in the meantime, changing market needs are putting pressure
on producers to build new facilities since some buyers of grain seek to
limit purchases to specialty grains that are not genetically modified
or to segregate either specialty crops or grains that are not
genetically modified. To meet those demands, while utilizing the
benefits of genetically modified grains for other markets, the producer
may find it necessary to grow different kinds of grain in which case
they may need separate storage facilities in order to guarantee the
proper identity of the grains. Many producers, however, will not be
able to meet that need without the assistance provided for in this rule
and will not be able to do so in a timely manner for this crop year
unless this rule is made effective immediately. In addition, a delay in
implementing this rule could also mean that producers, who otherwise
might be helped and who are the most in need, will be unable to take
full advantage of CCC's nonrecourse marketing assistance loan program
for the current marketing year. For those producers who cannot store
their crops, the only program option available is the loan deficiency
payment available at the time of harvest, thus denying those producers
the ability to delay marketings until a more favorable market situation
might arise. Moreover, the lack of adequate facilities can mean that
the producer also loses out on the other guarantees and assistance that
a marketing loan can afford the producer such as the special benefits
that can inure to a producer as a result of a marketing loan when the
producer has reached the maximum limitation on the amount of payments
that the producer can receive in the form of loan deficiency payments
or marketing loan gains.
    Storage conditions have not improved materially in the last few
months so as to relieve the shortage of storage and, therefore, there
is a critical need to act as quickly as possible. The public interest
in this respect has been established by the Congressional direction
contained in Section 4(h) of the CCC Charter Act (15 U.S.C. 714b(h)),
which requires a storage program whenever it is determined that there
is a shortage of a storage. Furthermore, while the need for immediate
assistance is critical, the potential harm to other parties, by
issuance of this rule as an interim rule, is expected to be minimal by
comparison. In addition, the rule is flexible enough so that, in the
event that any comments are received that would dictate a reason to
suspend the program, a suspension could be imposed before the response
to the comments is published. Even after the interim rule is issued, it
will take some time to complete loan applications. As a result, a delay
in the start-up of the program until comments could be received would
put availability of the program beyond the time in which many producers
in need of storage could obtain relief for the current crop year. This
could be damaging not only to the producers themselves but also to the
effort to increase the marketability in all markets of U.S.-produced
grains.
    Accordingly, for all the foregoing reasons, it has been determined
that the provisions of this rule should be made effective immediately.

The Small Business Regulatory Enforcement Fairness Act

    The finding made above, that this rule should be made effective
immediately, applies for all purposes including, but not limited, to
the provisions of 5 U.S.C. 808 of the Small Business regulatory
Enforcement Fairness Act (SBREFA), which provides that a rule may,
without regard to certain special Congressional oversight measures
provided for in SBREFA, take effect at such time as the agency may
determine if the agency finds for good cause that public notice is
impracticable, unnecessary, or contrary to the public interest. For the
reasons set out, it has been determined that delay would be contrary to
the public interest and that the rule should be made effective
immediately.

Cost Benefit Analysis Summary

    U.S. grain storage capacity steadily declined from 1987 to 1997.
Storage capacity has increased modestly since its low in 1997, but
increases have not been sufficient to keep pace with growing
production. Despite persistent harvest-time storage capacity shortfalls
and the advantages of on-farm storage for producers, low commodity
prices and reduced farm income will limit the ability of producers to
significantly expand their on-farm storage. The Farm Storage Facility
Loan Program will add additional storage capacity in deficit areas and
help farmers adapt to identity preserved storage and handling
requirements for genetically enhanced organisms. One direct benefit to
producers from the Farm Storage Facility Loan Program would be reduced
financing costs on facility construction. Interest savings for a farmer
on the construction of a 15,000-bushel grain bin could total as much as
$3,840 under the program when compared with financing through some
commercial banks. Producers would also benefit from the potential for
higher

[[Page 30347]]

market returns on their crops because on-farm storage capacity creates
pricing and hedging opportunities that can significantly increase
marketing returns. The Farm Storage Facility Loan Program is expected
to expand on-farm storage by more than 750 million bushels over the
next 5 years.

Background

    Section 5(b) of the CCC Charter Act (15 U.S.C. 714c(b)) authorizes
CCC to use its general powers to make available materials and
facilities required in connection with the production and marketing of
agricultural commodities. Section 4(f) of the CCC Charter Act (15
U.S.C. 714b(h)) provides that the Corporation may make loans to grain
producers needing storage facilities and that loans shall be made in
areas in which the Secretary determines that there is a deficiency of
such storage.
    CCC made loans for storage facilities intermittently since 1948 and
stopped making new storage facility loans in 1982 based on studies that
revealed that producers had sufficient storage for their crops. Since
1995, the storage situation has changed. Storage capacity utilization
rates are running extremely high and storage shortages exist in some
areas. The net decrease in storage capacity from 1996 to 1998 has been
about 79.5 million bushels, of nearly 1 percent of total capacity.
During this same period, grain production increased by nearly 8
percent, from 14 billion bushels in 1996 to 15 billion bushels in 1998.
As a result, there is insufficient capacity to allow farmers to store
their grain, forcing farmers to sell at harvest when prices are usually
at their lowest.
    CCC's immediate intent is to use this program to address the
existing shortage of grain storage. However, section 5(b) of the CCC
Charter Act, gives CCC broad authority to make ``available materials
and facilities required in connection with the production and marketing
of agricultural commodities''. Thus, CCC will explore marking available
facility loans for the storage of commodities harvested as other than
grain such as silage, alternative types of storage arrangements such as
``condominium storage'', or storage facilities for other agricultural
products. Since CCC has not identified shortages in storage facilities
for other than whole grain or analyzed the feasibility of alternative
storage arrangements, it would be improper to implement such provisions
under an interim rule. CCC is seeking comments during the comment
period on all of these aforementioned areas. Comments received will be
given consideration for inclusion in the final rule.
    On February 2, 2000, the Secretary announced the availability of
financing for farm storage and handling facilities. Based upon this
announcement, producers may have made commitments to construct on-farm
storage facilities. The decision has been made to extend loan
eligibility to those producers who took action on or after February 2,
2000 based on the Secretary's announcement.
    Although a similar program was available in the past, this rule
allows for a new farm storage facility loan program with terms and
conditions that differ from the previous program. The rule calls for
eligible producers to apply for farm storage facility loans at their
FSA administrative county office. Producers requesting loans must
provide information regarding the need for farm storage capacity and
the storage facility they propose to construct. They must also
establish that they are eligible for the program, and that the site
proposed for a storage structure does not adversely impact the
environment.
    Specific eligibility requirements for applicants are a satisfactory
credit rating as determined by CCC; no delinquent Federal debt as
defined by the Debt Collection Improvement Act of 1996; production of
facility loan commodities; proof of crop insurance from FCIC or a
private company; compliance with USDA provisions for highly erodible
land and wetlands; ability to repay the debt resulting from the
program; compliance with any applicable local zoning, land use and
building codes for the applicable farm storage facility structures; and
need for new or additional farm grain storage or handling capacity.
This information is needed by CCC to make loans where there is a
bonafide need, and to make loans that will be repaid on time.
    County offices will use existing office records to determine if the
producer is in compliance with highly erodible land and wetlands
provisions. The county office will utilize a government wide system to
identify if the applicant is delinquent on any Federal debt. The
applicant's credit history will be obtained using existing credit
reporting agencies that are contracted to FSA. Proof of crop insurance
must be provided by the applicant in the form of an approved crop
insurance application or statement of coverage for the current crop
year. Applicants must provide copies of local building permits, if
applicable, to demonstrate compliance with local land use laws.
    Applicants will be required to file requests for farm storage
facility loans on form CCC-185, Loan Application for Farm Storage
Facility and Drying Equipment Loan Program. The applicant must provide
information that is generally unavailable to CCC from other sources,
such as, name, address, tax identification number and phone number of
the person applying for the loan; the purpose of the loan and the
amount of the loan requested; and details about the type and cost of
the storage structure, and related handling systems, or drying systems
the applicant proposes to install. This information becomes the basis
for the net cost of eligible components which determines the amount of
the loan. Producers must also provide specific commodity production
data that supports the determination the producer requires storage or
that existing facility loan commodity storage capacity is not adequate.
This will help insure that CCC is not lending funds on capacity that is
not needed. The applicant must provide information regarding whether
the facility equipment has been purchased, delivered, or installed.
    The applicant must sign CCC-185 when it is complete and will be
provided a copy. Information to support the applicant's request will
also be necessary. Financial information will be obtained from the
applicant to determine if the applicant has the means to provide the
required down payment and to make future loan installments. The
applicant will be asked to verify debts and assets in order to prepare
an accurate balance sheet and cash flow statement. The applicant will
be asked to sign the form authorizing financial institutions and
creditors to release asset and debt information to CCC. The applicant
will be required to sign a UCC-1 Financing Statement and other forms as
needed to grant CCC a security interest in the proposed structure and
equipment. Upon acceptance of a complete application, a CCC
representative will conduct a lien search as needed.
    Borrowers must maintain the collateral in good condition; pay loan
installments and real estate taxes on time, and maintain all peril
structural, and if applicable, flood insurance policies. FSA will
conduct annual collateral checks. If installments are not paid during
each due and payable period, collection activity will proceed according
to standard CCC policy.

List of Subjects in 7 CFR Part 1436

    Applicability, administration, definitions, availability of loans,
eligible borrowers, eligible storage facilities, term of loan, security
of loan, amount of loan and loan application approvals, downpayment,
interest, repayment of loan, taxes, maintenance,

[[Page 30348]]

disbursements, sale or conveyance, environmental compliance.

    Accordingly, for the reasons set forth in the preamble, the
Commodity Credit Corporation adds 7 CFR part 1436 to read as follows:
PART 1436--FARM STORAGE FACILITY LOAN PROGRAM REGULATIONS
Sec.
1436.1 Applicability.
1436.2 Administration.
1436.3 Definitions.
1436.4 Availability of loans.
1436.5 Eligible borrowers.
1436.6 Eligible storage facilities or handling equipment.
1436.7 Term of loans.
1436.8 Security for loan.
1436.9 Loan amount and loan application approvals.
1436.10 Down payment.
1436.11 Disbursements.
1436.12 Interest.
1436.13 Repayment of loan.
1436.14 Taxes.
1436.15 Maintenance.
1436.16 Sale or conveyance.
1436.17 Environmental compliance.

    Authority: 15 U.S.C. 714 et seq.

PART 1436--FARM STORAGE FACILITY LOAN PROGRAM REGULATIONS

Sec. 1436.1 Applicability.

    The regulations of this part provide the terms and conditions under
which CCC may provide low-cost financing for producers to build or
upgrade on-farm storage and handling facilities. Because liens and
security interests related to this activity may be governed by state
law, CCC may adapt certain procedures relating to those issues that may
vary between states.

Sec. 1436.2 Administration.

    (a) The Farm Storage Facility Loan Program shall be administered
under the general supervision of the Executive Vice President, CCC or
designee and shall be carried out in the field by State FSA committees,
county FSA committees and FSA employees.
    (b) State FSA committees, county FSA committees and FSA employees,
do not have the authority to modify or waive any of the provisions of
the regulations of this part.
    (c) The State FSA committee shall take any action required by these
regulations that has not been taken by the county committee. The State
FSA committee shall also:
    (1) Correct, or require the county FSA committee to correct, any
action taken by such county FSA committee that is not in accordance
with the regulations of this part; and
    (2) Require the county FSA committee to withhold taking any action
that is not in accordance with the regulations of this part.
    (d) No provision or delegation herein to a State or county FSA
committee shall preclude the Executive Vice President, CCC, or a
designee, or the Administrator, FSA, or a designee, from determining
any question arising under the program or from reversing or modifying
any determination made by the State or county FSA committee.
    (e) The Deputy Administrator, Farm Programs, FSA, may authorize
State and county FSA committees to waive or modify deadlines and other
program requirements in cases where lateness or failure to meet such
other requirements does not adversely affect the operation of the Farm
Storage Facility Loan Program.
    (f) A representative of CCC may execute Farm Storage Facility Loan
Program applications and related documents only under the terms and
conditions determined and announced by CCC. Any such document that is
not executed in accordance with such terms and conditions, including
any purported execution prior to the date authorized by CCC, shall be
null and void.
    (g) The Deputy Administrator may suspend this program at any time
when it appears that there is no shortage of storage that needs to be
addressed or where some other reason shall arise for which it appears
that the program goals can be achieved more efficiently in a manner
different from that provided for this part.

Sec. 1436.3 Definitions.

    The following definitions shall be applicable to the program
authorized by this part and will be used in all aspects of
administering this program:
    Aggregate outstanding balance means the sum of the outstanding
balances of all loans disbursed to the applicant.
    Assumption means the act or agreement by which one borrower takes
over or assumes the mortgage debt of another borrower.
    Collateral means the storage structure, drying equipment or
handling equipment securing the loan.
    Consent, disclaimer, severance, or subordination agreement means an
agreement under which a party may consent to the security interest of
another in property, disclaim security interest in property, or
subordinate security interest in property to the interest of another
party.
    Facility loan commodity means wheat, rice, soybeans, sunflower
seed, canola, rapeseed, safflower, flaxseed, mustard seed, crambe,
other oilseeds as determined and announced by CCC, corn, grain sorghum,
oats, or barley harvested as whole grain.
    Financing statement. means a document that gives legal notice of a
lien on chattel property when properly filed or recorded.
    Non-movable or non-salable collateral means either collateral the
county committee determines cannot be sold and moved to a new location
because of the type of construction or collateral that has deteriorated
to the point that it has no sale recovery value.
    Person means any individual, group of individuals, partnership,
corporation, estate, trust, association, cooperative, or other business
enterprise, or other legal entity who is, or whose members are, a
citizen or citizens of, or legal resident alien in the United States.
    Uniform Commercial Code means the multi-state code of laws covering
commercial transactions such as sales, negotiable instruments, and
secured transactions.

Sec. 1436.4 Availability of loans.

    (a) An application for a loan shall be submitted to the
administrative county office that maintains the records of the farm or
farms to which the application applies. Upon request, the applicant
shall furnish information and documents as the state or county
committee deems reasonably necessary to support the application. This
may include financial statements, receipted bills, invoices, purchase
orders, specifications, drawings, plats, or written authorization of
ingress and egress.
    (b) Producers who authorize actions without an approved loan, do so
at their own risk and without creating any liability on behalf of CCC
except for producers who between February 2, 2000 and May 11, 2000 took
action based on the announcement of the program. Such action may
include, but is not limited to, entering into purchase contracts,
purchases of materials, taking delivery of parts, site preparation, and
construction.

Sec. 1436.5 Eligible borrowers.

    (a) The term ``eligible borrower'' means any person who, as
landowner, landlord, operator, producer, tenant, leaseholder, or
sharecropper:
    (1) Has a satisfactory credit history, and demonstrates an ability
to repay the debt arising under this program;

[[Page 30349]]

    (2) Has no delinquent Federal debt defined by the Debt Collection
Improvement Act of 1996;
    (3) Is a producer of a facility loan commodity;
    (4) Demonstrates a need for increased storage capacity;
    (5) Provides proof of crop insurance from FCIC or a private
company;
    (6) Is in compliance with USDA provisions for highly erodible land
and wetlands conservation according to 7 CFR part 12;
    (7) Demonstrates compliance with any applicable local zoning, land
use, and building codes for the applicable farm storage facility
structures;
    (8) Provides proof of flood insurance if CCC determines such
insurance is necessary to protect the interests of CCC, and proof of
all peril structural insurance, to CCC annually; and
    (9) Demonstrates compliance with the National Environmental Policy
Act regulations at 40 CFR, parts 1500 through 1508.
    (b) [Reserved]

Sec. 1436.6 Eligible storage facilities for handing equipment.

    (a) Loans may be made only for the purchase and installation of
eligible storage facilities and permanently affixed drying and handling
equipment, or for the remodeling of existing storage facilities or
permanently affixed drying and handling equipment as provided in this
section. Eligible storage and handling facilities shall include the
following:
    (1) New conventional-type cribs or bins designed and engineered for
whole grain storage and having a useful life of at least 10 years;
    (2) Oxygen-limiting and other upright silo-type structures designed
for whole grain storage and having a useful life of at least 10 years;
and
    (3) Flat-type storage structures for which the primary use is to
store whole grain.
    (b) The calculation of the loan amount may include costs associated
with building or improving an eligible storage and handling facility,
including:
    (1) Permanently affixed grain handling equipment and grain drying
equipment, including perforated floors considered to be essential to
the proper functioning of the grain storage system;
    (2) Safety equipment such as lighting, inside and outside ladders;
    (3) Equipment to improve, maintain, or monitor the quality of
stored grain, such as cleaners, moisture testers, and heat detectors;
    (4) Electrical equipment, including labor and materials for
installation, such as lighting, motors, and wiring integral to the
proper operation of the grain storage and handling equipment; and
    (5) Concrete foundations, aprons, pits, and pads (including site
preparation, labor and materials) essential to the proper operation of
the grain storage and handling equipment.
    (c) Ineligible storage and handling equipment with respect to which
no loans for installation or related costs shall be disbursed under
this part include:
    (1) Portable grain drying equipment and portable augers;
    (2) Structures of a temporary nature that require the weight or
bulk of the stored commodity to maintain its shape (such as fences or
bags);
    (3) Structures that are bunker-type, horizontal, or open silos;
    (4) Structures that are not suitable for storing the facility loan
commodities for which a need is determined; and
    (5) Storage structures to be used for commercial purposes.
Commercial purpose is defined as the storage and handling of grain,
whether paid or unpaid, for persons other than the loan applicant.
State FSA committees may allow, subject to the approval of the Deputy
Administrator, Farm Programs, FSA, exceptions to this requirement if an
applicant is otherwise eligible and the intent and purpose of the Farm
Storage Facility Loan program is being met. Any facility that is in
working proximity to any commercial storage operation, shall be
considered to be part of a commercial storage operation.
    (d) Loans may be approved for financing additions to more
modifications of an existing storage facility to increase storage
capacity if the county FSA committee determines that the modification
is necessary to increase the storage capacity of the unit and is not
for maintenance, repair, or replacement of items such as motors, fans,
or wiring.

Sec. 1436.7 Term of loan.

    The maximum term of the loan shall be 7 years from the date of
execution of a promissory note and security agreement. No extensions of
the loan term will be granted.

Sec. 1436.8 Security for loan.

    (a) All loans shall be secured by a promissory note and security
agreement covering the farm storage facility. The promissory note and
security agreement shall grant CCC a security interest in the
collateral and shall be perfected in the manner specified in accordance
with applicable state law. CCC's security interest in the collateral
shall constitute the sole security interest in such collateral except
for prior liens on the underlying realty that by operation of law
attaches to the collateral if it is or becomes a fixture. If any such
prior lien on the realty will attach to the collateral, a waiver,
severance, or subordination of such lien must be obtained in writing
from each person having an interest in the real estate on which the
collateral is to be located. No additional liens or encumbrances may be
placed on the storage facility after the loan is approved unless CCC
approves otherwise in writing.
    (b) A lien on the real estate on which the farm storage facility is
located will be required on all loans in the form of a real estate
mortgage, deed of trust, or other security instrument approved by the
CCC. For loan amounts exceeding $50,000, CCC's interest in the real
estate shall be superior to all other lien holders. If the real estate
is covered by a prior lien, a lien may be obtained by means of a
subordination agreement prescribed by CCC. CCC will not require such an
agreement from any agency of the Department of Agriculture.
    (c) Real estate liens may cover an acreage of land separate from
the collateral if a lien on the underlying real estate is not feasible
and if:
    (1) The borrower owns the separate acreage; and
    (2) The acreage is large and valuable enough, in the approving
authority's opinion, to insure repayment of the loan.
    (d) Notwithstanding paragraphs (a), (b) and (c) of this section, a
borrower, in lieu of such liens as are otherwise required by those
paragraphs, may provide a letter of credit, bond, or other form of
security, as approved by CCC.
    (e) If an existing structure is remodeled and an addition becomes
an attached, integral part of the existing storage structure, CCC's
security interest shall include the existing storage structure.
    (f) The cost of filing and recording all real estate liens and
later subordinations will be paid by the borrower. CCC shall pay such
costs relating to filing and recording financing statements.

Sec. 1436.9 Loan amount and loan application approvals.

    (a) The cost on which the loan shall be based is the net cost of
the eligible facility, accessories, and services to the applicant after
discounts and rebates, not to exceed a maximum per-bushel cost
established by the State FSA committee.
    (b) The net cost for storage and handling equipment may include
purchase price, sales tax, shipping, and delivery charges. The net cost
shall not include secondhand material or any

[[Page 30350]]

other item that is determined by the approving authority to be
ineligible for loan.
    (c) The principal amount of any farm storage facility loan shall be
75 percent of the net cost of the applicant's needed storage or
handling equipment not to exceed $100,000. Borrowers are limited to
obtaining one loan per fiscal year under this part.
    (d) The aggregate outstanding balance of all facility loans for any
one borrower may not exceed $100,000.
    (e) When a storage structure has a larger capacity than the
applicant's needed capacity, as determined by CCC, the net cost
eligible for a loan shall be prorated. Only costs associated with the
applicant's needed storage capacity will be loan-eligible.
    (f) The county FSA committee may approve applications, if loan
funds are available, up to the maximum approval amount unless the State
FSA committee establishes a lower limit for country FSA committee
approval authority.
    (g) Loan approvals will expire four months after the date of
approval unless extended in writing for an additional four months by
the State FSA committee.

Sec. 1436.10 Down payment.

    (a) A minimum down payment representing the difference between the
net cost of the storage facility and the amount of the loan determined
in accordance with Sec. 1436.9 shall be made by the loan applicant to
the supplier or contractor before the loan is disbursed.
    (b) The down payment shall be in cash unless some other form of
payment is approved by CCC.
    (c) The down payment may not include any trade-in, discount,
rebate, credit, deferred payment, post-dated check, or promissory note
to the supplier or contractor.

Sec. 1436.11 Disbursement.

    (a) Disbursement of the loan by CCC will be made when the farm
storage facility has been delivered, erected, constructed, assembled,
or installed and a CCC representative has inspected and approved such
facility.
    (b) Disbursement will be made only if the borrower furnishes
satisfactory evidence of the total cost of the facility and payment of
all debts on the facility in excess of the amount of the loan.
    (c) Disbursement may be made jointly to the borrower and the
contractor or supplier, except disbursement may be made to the borrower
if CCC determines the borrower has paid the contractor or supplier all
amounts that are due and owing with respect to the facility.

Sec. 1436.12 Interest.

    (a) Loans shall bear interest at the rate equivalent to the rate of
interest charged on Treasury securities of comparable maturity on the
date the loan is approved.
    (b) The interest rate for each loan will remain in effect for the
term of the loan.
    (c) The loan applicant shall pay a non-refundable application fee
of at least $45 to CCC

Sec. 1436.13 Payment of loan.

    (a) Equal installments of principal plus interest will be amortized
over the loan term. Installments are due and payable by no later than
the last day of each 12 month period of the loan, until the principal
plus interest has been paid in full.
    (b) The payment of each installment may be by cash, money order,
wire transfer, or by personal, certified, or cashier's check. Repayment
shall be applied first to accrued interest and then to principal.
    (c) A claim will be established in accordance with 7 CFR part 1403
for the principal and accrued interest amount due and late payment
interest for any installment that is not paid within 30 days after the
due and payable date.
    (d) Loan amounts outstanding, whether or not overdue, may be
collected from payments that the borrower may otherwise be due to
receive as marketing loan gains or other payments under 7 CFR part 1421
or 7 CFR part 1427. In the even that a claim is established against a
borrower for any amount due under this part, the provisions of 7 CFR
part 1403 may be used to recover the debt from other Federal payments
or loans.
    (e) CCC may declare the entire indebtedness immediately due and
payable if the borrower violates any of the terms and conditions of
this part, fails to pay any installment on time, or breaches any of the
terms and conditions of any of the instruments executed in connection
with the loan, or if the collateral is used in connection with any
unauthorized commercial operation including, but not limited to,
elevators, warehouses, dryers or processing plants, during the life of
the loan.
    (f) The loan may be paid in full or in part at any time before
maturity.
    (g) Upon payment of a loan, CCC shall release CCC's security
interest in the collateral.

Sec. 1436.14 Taxes.

    The borrower must pay all real and personal property taxes that may
affect CCC's security interest in all collateral securing the note
evidencing the loan. To protect its interests, CCC may pay any unpaid
taxes with respect to the collateral securing a loan made in accordance
with this part, and if CCC does so, the borrower shall reimburse CCC
for such payment, and if unpaid by the borrower, such debt shall become
part of the current installment due.

Sec. 1436.15 Maintenance.

    (a) The borrower must maintain the loan collateral in a condition
suitable for the storage of one or more of the facility loan
commodities.
    (b) Until the loan has been repaid, the borrower shall be liable
for all damages to or destruction of the collateral. CCC shall not
assume any loss of the loan collateral.
    (c) CCC shall conduct annual collateral checks to insure compliance
with this section.
    (d) Structures must be insured against all perils in all cases and
must also be insured against flooding if the structure is located in a
flood plain, as determined by CCC. Proof of flood insurance, if
required, and proof of all peril structural insurance, must be provided
to CCC annually. CCC must be listed as a loss payee on all peril and
flood insurance policies.
    (e) CCC shall have rights in ingress and egress where the facility
is located. Failure of the borrower to secure such access will render a
borrower ineligible for the loan and, if a loan has already been made
shall constitute a loan violation for which the remaining balance of
the loan shall became due immediately.

Sec. 1436.16 Sale or conveyance.

    (a) The collateral or land securing a loan may be sold by CCC
whenever CCC has declared the entire indebtedness immediately due and
owing under this part or when the borrower voluntarily conveys the
collateral to CCC before repaying the loan. Before a borrower sells or
conveys the facilities or other property securing a loan without
repaying the loan in full, the borrower shall obtain approval for the
sale or conveyance from the county FSA committee.
    (b) Assumption of a farm storage facility loan is permitted.

Sec. 1436.17 Environmental compliance.

    (a) Except as otherwise specified in this section, prior to
approval of any farm storage facility loan, an environmental evaluation
will be completed to determine if the proposed action will have any
adverse impacts on the environmental and cultural resources.
    (b) If it is determined that a proposed action or group of proposed
actions will

[[Page 30351]]

not result in any adverse impact, the action will be considered as
being categorically excluded for the purpose of compliance with the
National Environmental Policy Act (NEPA), 40 CFR parts 1500 through
1508.
    (c)(1) If adverse environmental impacts, either direct or indirect,
are identified, an environmental assessment will be completed in
accordance with the Council on Environmental Quality's Regulations for
Implementing the Procedural Provisions of NEPA to the extent required
by law.
    (2) The environmental assessment will be used to develop an action
that results in no significant environmental impact on the human
environment or cultural resources.
    (3) No action will be approved that has been determined to have
significant impacts on the human environment or cultural resources.
    (d)(1) In order to minimize the exposure to environmental
liabilities from the presence of contamination on real estate
collateral, an evaluation will be made of the economic and
environmental risks to the real estate collateral posted by the
presence of hazardous substances and petroleum products.
    (2) If the evaluation made under paragraph (d)(1) of this section
reveals that the collateral is or may be contaminated, then the
applicant will be notified and given an option of offering as
collateral other real estate that is free from contamination or
remediating the contamination on the original site offered as
collateral.

    Signed at Washington, D.C., on May 8, 2000.
Keith Kelly,
Executive Vice President, Commodity Credit Corporation.
[FR Doc. 00-11833 Filed 5-10-00; 8:45 am]
BILLING CODE 3410-05-M



This archive was generated by hypermail 2b29 : 2000/05/17 EST