[Federal Register: September 20, 2000 (Volume 65, Number 183)]
[Notices]
[Page 56864-56865]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr20se00-49]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Forest Service
Woronkofski Environmental Impact Statement
AGENCY: Forest Service, USDA.
ACTION: Notice of intent to prepare an Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: The Department of Agriculture, Forest Service, will prepare an
Environmental Impact Statement (EIS) to provide timber for the Tongass
timber sale program. The proposed action is to harvest an estimated 5-
15 million board feet (mmbf) of timber on an estimated 300-800 acres in
one or more timber sales. A range of alternatives responsive to
significant issues will be developed and will include a no-action
alternative. A Record of Decision will be prepared to disclose if and
how the Forest Service has decided to provide harvest units, roads, and
associated timber harvesting facilities. The proposed timber harvest is
located within Tongass Forest Plan Value Comparison Unit 461 on
Woronkofski Island, Alaska, Wrangell Ranger District of the Tongass
National Forest.
DATES: Comments concerning the scope of this project should be received
by October 27, 2000. The Draft EIS is projected to be filed with the
Environmental Protection Agency (EPA) in April 2001. The Final EIS is
anticipated by October 2001.
ADDRESSES: Please send written comments to Wrangell Ranger District;
Attn: Woronkofski EIS; P.O. Box 51, Wrangell, AK 99929.
FOR FURTHER INFORMATION CONTACT: Randy Hojem, Acting District Ranger,
or Dee Galla, IDT Leader, Wrangell Ranger District, Tongass National
Forest, P.O. Box 51, Wrangell, AK 99929 telephone (907) 874-2323.
SUPPLEMENTARY INFORMATION: Public participation will be an integral
component of the study process and will be especially important at
several points during the analysis. The first is during the scoping
process. The Forest Service will be seeking information, comments, and
assistance from Federal, State, local agencies, individuals and
organizations that may be interested in, or affected by, the proposed
activities. The scoping process will include: (1) Identification of
potential issues; (2) identification of issues to be analyzed in depth;
and, (3) elimination of insignificant issues or those which have been
covered by a previous environmental review. Written scoping comments
are being solicited through a
[[Page 56865]]
scoping package that will be sent to the project mailing list and to
those that request the package. For the Forest Service to best use the
scoping input, comments should be received by October 27, 2000.
Based on results of scoping and the resource capabilities within
the project area, alternatives including a ``no action'' alternative
will be developed for the Draft Environmental Impact Statement (Draft
EIS).
The comment period on the draft environmental impact statement will
be a minimum of 45 days from the date the Environmental Protection
Agency publishes the notice of availability in the Federal Register.
The Forest Service believes it is important to give reviewers
notice of several court rulings related to public participation in the
environmental review process. First, reviewers of draft environmental
impact statements must structure their participation in the
environmental review of the proposal so that it is meaningful and
alerts an agency to the reviewer's position and contentions. Vermont
Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 553, (1978).
Environmental objections that could have been raised at the draft
environmental impact statement stage may be waived or dismissed by the
courts. City of Angoon v. Hodel, 803 F.2nd 1016, 1022 (9th Cir. 1986)
and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D.
Wis. 1980). Because of these court rulings, it is very important that
those interested in this proposed action participate by the close of
the comment period so that substantive comments and objections are made
available to the Forest Service at a time when it can meaningfully
consider them and respond to them in the final environmental impact
statement.
To assist the Forest Service in identifying and considering issues
and concerns of the proposed action, comments during scoping and
comments on the draft environmental impact statement should be as
specific as possible. It is also helpful if comments refer to specific
pages or chapters of the draft statement. Comments may also address the
adequacy of the draft environmental impact statement or the merits of
the alternatives formulated and discussed in the statement. Reviewers
may wish to refer to the Council on Environmental Quality Regulations
for implementing the procedural provisions of the National
Environmental Policy Act at 40 CFR 1503.3 in addressing these points.
Comments received in response to this solicitation, including names and
addreses of those who comment, will be considered part of the public
record on this proposed action and will be available for public
inspection. Comments submitted anonymously will be accepted and
considered; however, those who submit anonymous comments will not have
standing to appeal the subsequent decision under 36 CFR Parts 215 or
217. Additionally, pursuant to 7 CFR 1.27(d), any person may request
the agency to withhold a submission from the public record by showing
how the Freedom of Information Act (FOIA) permits such confidentiality.
Requesters should be aware that, under FOIA, confidentiality may be
granted in only very limited circumstances, such as to protect trade
secrets. The Forest Service will inform the requester of the agency's
decision regarding the request for confidentiality, and where the
request is denied, the agency will return the submission and notify the
requester that the comments may be resubmitted with or without name and
address within 7 days.
Permits: Permits required for implementation include the following:
1. U.S. Army Corp of Engineers
--Approval of discharge of dredged or fill material into the waters
of the United States under Section 404 of the Clean Water Act;
--Approval of the construction of structures or work in navigable
waters of the United States under Section 10 of the Rivers and Harbors
Act of 1899;
2. Environmental Protection Agency
--National Pollutant Discharge Elimination System (402) Permit;
--Review Spill Prevention Control and Countermeasure Plan;
3. State of Alaska, Department of Natural Resources
--Tideland Permit and Lease or Easement;
4. State of Alaska, Department of Environmental Conservation
--Solid Waste Disposal Permit;
--Certification of Compliance with Alaska Water Quality Standards
(401 Certification).
Responsible Official
Thomas Puchlerz, Forest Supervisor, Tongass National Forest,
Federal Building, Ketchikan, Alaska 99901, is the responsible official.
The responsible official will consider the comments, response,
disclosure of environmental consequences, and applicable laws,
regulations, and policies in making the decision and stating the
rationale in the Record of Decision.
Dated: September 5, 2000.
Thomas Puchlerz,
Forest Supervisor.
[FR Doc. 00-24079 Filed 9-19-00; 8:45 am]
BILLING CODE 3410-11-M
This archive was generated by hypermail 2b29 : 2000/09/20 EST